Each turbine will be mounted on a tower which will connect to the national power supply grid via underwater cables.
每个涡轮机将被安装在一个塔上,塔将通过水下电缆连接到国家电网。
The scheme of power supply not only relates to Henan power grid of power construction planning and dispatching& operation, but also relates to benefit of Sanxia hydro- power .
三峡水电站分配河南电网电力电量方案,不仅关系到河南电网的电源建设规划和调度运行,而且关系到三峡水电站电力电量效益的发挥。
应用推荐